leontheprofessional
1566
64
3
The tub before, to the right is a standing shower
The end of the tub, over the half wall is the toilet.
Putting the tiles up; lots of spacers used.
The glass accent tile, which the homeowner picked out, going from the shower to the end of the half-wall where the toilet is.
Close up of the tile, with the accent bar of glass.
Next day after the tiles have set and adhered. Grout changes the look completely.
Edging I installed on the wall to cover the ends of the tile. Matching caulk was used to make it a seamless transition from tile to wall.
Finished grouting of the tub surround.
Close-up of the half wall and end of the surround.
NuckinFutz13
Very nice.
akarram
I'm a realtor and look at this ish all day. And that's one of the cleanest jobs I've seen
shinypoops
Congrats on your business. That's a leap of faith.
IMakeUpRandomFacts
I'm no plumber but it's gonna leak at the mixing valve
whatalesyou1
NIce! I am looking for someone to fix a "custom" tile job. Where are you?
kittenkisses
Beautiful work OP. Teach me!
mirrorz
Did you use grout or caulk in the corner?
IMakeUpRandomFacts
You spelled cock wrong
Jester123ish
Your workmanship is excellent. The colors are too drab though.
saberwolf617
The customer is always right
Jester123ish
Did you say that through clenched teeth? : )
saberwolf617
They said service with a smile, there's no rules on the teeth :D